Construction on the Hartman Bridge (Huron Street) is coming!

Estimated construction dates: September 29 – October 10
Construction will not stop during the hours that students are entering and leaving school.

  • Both sidewalks will remain open during construction.
  • Pedestrians should follow any signs that are posted.

Do your part to stay safe! Remain alert and careful.

Obey ALL work zone signs, personnel, and markings.

Safety Tips

  • Construction vehicles can move suddenly and quickly. Stay alert!
  • Keep to the sidewalks where available, and cross only where designated.
  • Reduce risk by crossing the street before getting to the work zone or going a block out of your way.
  • Construction work may be fascinating to watch but you need to get through the work zone safely. Don’t linger any longer than necessary.
  • Walk in groups or with an adult.
  • Give yourself extra time. You may need to wait until work and/or construction vehicles can be safely stopped to allow you through.
  • Keep far away from open excavations and active construction vehicles. Don’t assume workers know you are there!
  • Wait for eye contact and an acknowledgement that they are aware of you.
  • Be patient if they need to help escort you safely through the work zone.
  • Drivers – use the park and walk locations on this map to avoid delays and dangerous turnarounds.
  • Things to watch for in work zones
  • Orange work zone signs – show what is going on and how to travel safely through the work zone.
  • Construction worker acknowledgement – a hand signal or wave shows they have seen you and they will indicate when it is safe to proceed.